Water System – Mobile Units (Tuk Tuk)
Standard Operating Procedure (SOP)
Version: V2
Date: October 2025
Purpose: Manage water supply and drainage for mobile coffee units (Tuk Tuks) safely and hygienically.
Scope
All mobile Tuk Tuk units operated by Little Coffee Bean Co.
Equipment Required
- Fresh water barrel (food-grade)
- Wastewater barrel (food-grade)
- Water pump
- Fresh water pipe and connectors
- Wastewater pipe
- Thermometer
- Daily checklist
Starting Your Day
Step 1: Fresh Water Setup
- Position fresh water barrel next to Tuk Tuk
- Place fresh water pipe into barrel, ensuring it touches the bottom
- Secure pipe to prevent disconnection during operation
Step 2: Activate Water System
- Locate water pump (front of Tuk Tuk, next to driver’s seat)
- Turn pump ON
- Use fresh water tap (behind coffee machine on counter)
- Turn tap on and allow water to flow for 30 seconds
- Prime system: Place pipe into fresh water barrel and run until smooth flow (no air bubbles)
Step 3: Coffee Machine Activation
- Turn coffee machine to setting 2
- This activates the coffee machine water request system
- Check water is flowing smoothly through machine
- Record water temperature on daily log
During Service
Hourly Checks:
- Check water flow at tap
- Verify no leaks under machine
- Ensure pump is running (listen for motor sound)
- Monitor water barrel level
Water Pressure Issues:
- Check fresh water barrel is not empty
- Verify pipe is submerged in barrel
- Check pump switch is ON
- Listen for pump motor running
- Report to manager if pressure remains low
Drainage Management
Wastewater System:
- Grey pipe under coffee machine feeds to wastewater barrel
- Wastewater barrel must be emptied regularly throughout shift
- Dispose of wastewater via designated drain or sluice room
- Never allow barrel to overflow
Blocked Drains:
- Check black cup (thick grey pipe) is not blocked
- Clear any debris from cup opening
- Ensure grey pipe is not kinked
- If blockage persists, report to manager
Leak Detection:
- Check under coffee machine drip tray regularly
- Look for water pooling or dripping
- Inspect all pipe connections
- Small leaks: Report via incident form
- Large leaks: Notify manager immediately and submit incident form
Closing Your Day
- Turn off water pump
- Remove fresh water pipe from barrel
- Empty wastewater barrel completely
- Disconnect and drain wastewater pipe
- Store barrels safely
- Document any issues on checklist
- Report problems to manager
Weekly Maintenance
- Clean water barrel interior
- Inspect all pipes for cracks or damage
- Test water temperature
- Check pump operation
- Flush entire system
Safety Notes
- Do not operate without fresh water barrel in place
- Never leave pump running unattended
- Check for leaks before each service
- Report all water issues immediately
- Ensure barrels are food-grade certified